Cement Plant Kiln Conversion

Overview Hagerstown Cement Plant Expansion Conversion of existing long dry kiln to a preheater/precalciner kiln and increasing the plant capacity from 1500 Mtpd to 2400 Mtpd clinker, which was part of a larger modernization for the Holcim Hagerstown, MD Cement Plant. The project included installation of: Raw mill feed bins Raw mill system Preheater Main […]
EPCM Import Terminal

Overview PENTA developed an international cement plant import terminal for Trinidad Cement (TCL) in Georgetown, Guyana by providing key technical insights via site visits, site coordination, and estimating assessments to TCL and their site partner Guyana National Industrial Company (GNIC). Solutions During the development phases of every project, close collaboration with key project stakeholders […]
Underground Mine To Storage Facility Conversion

Overview With a static temperature of 58 degrees all year long, life in an underground mine is cool. Yet The Rock City Admiral Parkway Development almost didn’t become a reality. Owner Joe Koppeis had a geo-technical firm assess the viability of re-purposing this old mine prior to working with PENTA Engineering Corp. The geo-technical firm […]
Underground Mine Pillar Stability Project

Overview PENTA is currently working on a pillar stability assessment project for a functional underground mine where concerns for the safety of the mine’s operators existed. The mine owner decided to reassess their ground control plan after hiring a local contractor to remove the questionable arches from their pillars. The owner selected PENTA’s mining engineering […]
Harbor Barge Loadout & Dust Collection

Overview PENTA Completed a Harbor Barge Loadout Terminal & Dust Collection Project for a major cement producer in the United States. PENTA was requested to analyze the barge loadout and dust collection system and to provide structural engineering with shop fabrication drawings for the complete project. This included PENTA’s assessment for the constructability and the […]
ICR Article on Modular Distribution Terminals