EPCM Waste-To-Fuel Facility

PENTA was engaged to develop a waste-to-fuel production facility that produces a fuel source that can be used in calcination as a substitute for fossil fuels.
Primary Crusher Relocation Engineering

A gold mining client needed to relocate their 2500stph existing primary crusher to extend quarry life.
Tire Derived Fuel Facility

PENTA provided the engineering for the installation of a tire derived fuel (TDF) system at a plant in TX.
Distribution Terminal & Logistics

PENTA’s engineering team completed basic and detailed engineering design for all disciplines including mechanical, civil/structural, and electrical engineering.