PENTA FEATURED

logistics for industrial plant

modular distribution terminal - logistics - PENTA Engineering Company

Modular Distribution Terminal

PENTA completed this project to replace two portable transloaders used to transfer cement from rail cars to cement trucks with a permanent rail-to-truck terminal with 3,000 tons of storage capacity.

Cement Terminal Design-Build - PENTA Engineering Company

Cement Terminal Engineering Design

By optimizing cement terminal engineering design, PENTA has improved logistics and reduced plant downtime during construction on countless distribution terminal and transloading terminal projects over the last 30 years.

storage domes and silos - PENTA Engineering Company

EPC Cement Storage Dome

PENTA provided turnkey services for this storage dome project in Arkansas on an EPC (Engineering, Procurement, and Construction) basis.

READY TO
OPTIMIZE
YOUR INDUSTRIAL OPERATIONS?

Discover how PENTA’s tailored solutions can solve your toughest challenges. Reach out for expert guidance today.

Join Penta’s Mailing List.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.